The key benefit of the Slab-Mount is that it permitted us to set up the box and then run services prior to the construction of the walls. This was beneficial during a period when Hebel supply was lacking, which allowed us to maintain efficiency while keeping delays to the project schedule to a minimum.”
Take a look at how the SuperSTOPPER Slab-Mount was used in a recent Buildform- Residential and Commercial Building to improve project speed, ensure compliance and most important off all, keep occupants of the building safe!
This is just an excerpt. Click the the button to access the full case study.
FORMA & CONTRA by Buildform
A remarkable residential development in Roselands, NSW, comprising 100 thoughtfully designed apartments and terraces. The project also offers 153 dedicated car spaces, ensuring ample parking capacity for residents and guests. The project, designed by renowned architects Turner Studio, incorporates a mix of one-to-three-bedroom units and also includes a vibrant retail tenancy spanning an area of 700m², adding convenience and vibrancy to the project. The apartments and terraces are intelligently designed to maximize solar aspect, ensuring an abundance of natural light.
Why SuperSTOPPERSlab-Mount?
The SuperSTOPPER Slab-Mount system offers a comprehensive solution for efficient installation and fire-stopping of various services. By utilizing the Trafalgar SuperSTOPPER Slab- Mount, the need for individual penetrations and separate fire-stopping measures for each service is eliminated. The versatility and ability to accommodate multiple services through a single penetration have proven instrumental in ensuring the efficiency and compliance of the following services, which were successfully installed through the SuperSTOPPER Slab-Mount:
Challenge:
A challenge arose from a shortage of Hebel, a key construction material crucial for the project’s development. The scarcity of Hebel PowerPanels posed a significant threat, potentially causing delays and disruptions to the overall progress of the project. Inclusion of the SuperSTOPPER Slab-Mount proved to be a game-changer, offering remarkable advantages that were not previously anticipated. Using the SuperSTOPPER Slab- Mount allowed the project to circumvent the scarcity of Hebel PowerPanels by enabling the installation of services to proceed independently of the construction of walls. This breakthrough eliminated the need to wait for the walls to be constructed before commencing the installation of essential services such as plumbing, electrical wiring, and HVAC systems. By leveraging the SuperSTOPPER Slab-Mount, the construction team could expedite the project timeline significantly.
Advantages of the Trafalgar SuperSTOPPER Slab-Mount:
- Easy Fire-Stopping Installation
- Streamlined Penetration Management
- Thorough Testing and Certification
- Comprehensive Support and Technical Assistance
Access the PDF for more information. Click here
PDF Download
Click the button below to download this case study for easy reading and printing.